Safeguarding construction sites in the rainy summer: how professional construction management and project control safely navigate renovation projects
A rainy summer and basically any rainy day can become a real challenge for any renovation project. Particularly when renovating apartment buildings with loft conversions, unpredictable weather events can lead to complex construction site situations. Heavy downpours lead to soaked materials, slippery paths, disrupted schedules and an increased risk of accidents. This is where excellent project management comes into play. It enables construction management to react quickly to changes in the weather, minimize risks and ensure that construction progresses safely despite adverse conditions. Well thought-out planning is essential, especially during renovation work, in order to maintain safety and quality on the construction site.
.webp)
Weather-dependent planning: the key to resilient refurbishment
Modern construction projects in the renovation sector can hardly be implemented efficiently and safely without weather-dependent planning. The integration of current weather data into construction scheduling is now standard for all professional project management. For roof renovations in particular, it is crucial that sensitive work steps such as roof openings are only carried out in stable weather conditions.
What many people do not consider is that the weather can also play a role in screed work, insofar as the rain can influence the correct mixing ratio when working on the mixing machine and screed points. A small thing that often has a big effect. In the event of sudden precipitation, the site manager must be able to reschedule indoor work at short notice.
Transparent communication within the project team and with the client and local residents is also crucial. The daily documentation of weather events in the construction diary not only enables construction progress to be tracked, but also serves as an important tool for safeguarding against any claims. Dynamic and forward-looking construction management not only plans with weather buffer times, but also develops concrete alternative scenarios for critical construction phases. This flexibility is an elementary component of modern project management in refurbishment.
Material protection and warehouse logistics: protection in wet environments
Protecting building materials from moisture is a key issue on any construction site - especially in renovation projects involving sensitive building materials such as wood, mineral wool or electronic components. A rainy summer without suitable protection concepts can cause immense material losses. Storing materials in weatherproof containers, erecting temporary tents or covering them with high-quality tarpaulins are proven measures that should be an integral part of forward-looking project management.
In addition, the Federal Institute for Occupational Safety and Health (BAuA) recommends planning emergency drainage, drainage systems and water-repellent surfaces in the construction site layout plan. These should be checked and maintained regularly to ensure that water is drained away quickly in the event of heavy rainfall. This not only keeps the material dry, but also ensures safety on the construction site. The importance of well thought-out storage logistics under the guidance of the site manager is particularly evident when renovating existing buildings, where access is often restricted.
.webp)
Safety during roof work: Fall and slip prevention and weather protection
Roof work is one of the most dangerous activities on a construction site. If rain is added, the risk increases exponentially. The Employer's Liability Insurance Association for the Construction Industry (BG BAU) defines clear guidelines: Walkways with step ledges are required for roof pitches of eleven degrees or more, and additional steps for steeper pitches. Slip-resistant surface coverings and fixed side protection systems are essential.
The BG BAU also stipulates a clear order of priority for protective measures. Technical solutions such as side protection or fall arrest systems have priority over individual protective equipment. If the latter is unavoidable, suitable PPE against falls from a height (PPEgA) and a rescue concept must be available and trained. Work on the roof should generally be stopped in heavy rain, as neither materials nor people have a secure hold. Professional project management continuously assesses the weather conditions and supports the site management in making decisions to interrupt work.
For roof renovations, especially in seasons with a high risk of rain, a weather protection roof is a particularly effective, albeit cost-intensive, protective measure. The construction of a temporary protective roof over the entire roof surface effectively protects both the open roof and the building below from precipitation during the construction phase. This measure offers decisive advantages: it prevents costly moisture damage to the existing building, enables work to be carried out regardless of the weather and can therefore significantly reduce construction delays. The decision to install a weather protection roof should be considered in particular for valuable existing buildings, longer renovation periods or in rainy seasons. Even if the costs for installation and maintenance are considerable, the avoided risks and consequential damage as well as the secure construction process can justify this investment, especially for complex roof renovations.
Traffic routes and construction site access: Accessibility and safety
Rain poses a serious safety risk not only on roofs, but also on the ground. Temporary access roads and walkways quickly turn into slippery, muddy surfaces during prolonged rainfall. Gravel, road plates or temporary wooden plank paths prove their worth here, providing safe footing for both vehicles and pedestrians.
The selection of suitable floor coverings is also crucial. According to DGUV regulation R108-003, work surfaces must be slip-resistant and easy to clean. The classification into slip resistance classes (R9 to R13) provides guidance. This is supplemented by non-slip, weather-suitable footwear and visual markings. The site manager must also ensure that adjacent traffic areas such as footpaths or driveways remain clearly visible, even in poor light, by means of barrier systems and lighting. This form of project management is also a question of resident friendliness, particularly in the context of renovations in inhabited properties.
.webp)
Protective clothing and lighting: Visible in bad weather
As soon as visibility is restricted by rain, fog or dim light, protective clothing plays a crucial role. High-visibility clothing in accordance with DIN EN ISO 20471, ideally in class 2 or 3, is mandatory for all people working outdoors. Rain jackets and pants should also meet the requirements of DIN EN 343 in order to be waterproof and breathable at the same time.
In addition to clothing, adequate lighting on the construction site is essential. Even in light twilight or cloudy skies, a light intensity of at least 20 lux must be ensured on traffic routes, and significantly more in work areas. Mobile lighting columns with LED technology are just as suitable here as solar-powered warning lights for access points or scaffolding areas. In construction management, these aspects should be considered as early as the tender phase and integrated as an integral part of project management.
Risk assessment and training: Prevention through knowledge
A well-founded risk assessment is at the heart of all safety planning on the construction site. Weather conditions must be an integral part of this assessment and must be addressed in daily safety briefings. Site managers are required to make their teams aware of the special risks associated with rain and to train their teams in advance on how to behave in an emergency, such as heavy rain or thunderstorms.
A safety and health plan (SiGePlan), which defines clear responsibilities for the client, site management and safety coordination, is prescribed for complex projects in particular. The documentation of all measures, instructions and checks not only creates legal certainty, but also a high level of trust within the project team. This basis of trust is particularly important in refurbishment projects, as work is often carried out in inhabited or historically sensitive structures. Project management creates the organizational framework for safe and compliant implementation.
Technical and innovative solutions: When weather meets technology
Today, digitalization offers numerous opportunities to automate and improve safety processes. Weather apps with rain radar, digital construction diaries, video surveillance systems and mobile warning sensors help construction managers to identify risks in good time. Flexible barrier systems, automatic twilight switches and smart light poles also help to optimally secure the construction site even in difficult weather conditions.
Forward-looking project management integrates these technologies at an early stage and makes them an integral part of the process planning. This digital edge proves to be a decisive competitive advantage, especially when renovating historic or urban buildings, where space and environmental influences are particularly critical.
Conclusion
Refurbishment in the rainy summer places high demands on construction management and project control. Those who plan flexibly, consistently protect materials and routes, ensure technical and organizational safety and actively manage both employees and the construction site minimize delays and risks. A well thought-out strategy, combined with technical support and human know-how, makes the difference between project chaos and a showcase construction site. This makes it possible to see what excellent project management can achieve, even in the rain.
Discover the optimization potential of your building now
Optimization potential
Low
According to the brief analysis of the building, the building appears to be in good to very good condition in terms of energy. According to the demand calculation carried out, the building has "low" optimization potential. Testing more energy-efficient operation of the building can be a good measure for maintaining energy efficiency. Optimized operation can lead to lower heating costs for tenants and CO₂ costs for the landlord. Individual CAPEX measures can also secure the current condition of the building in the long term.
Following the brief analysis of the building, we recommend that you review and implement targeted energy measures. According to the requirements calculation, the building has "medium" optimization potential, which speaks for further energy optimization. A full ESG report, including iSFP / DIN V 18599, is advisable for an exact determination. This detailed report is prepared after an on-site inspection by our energy efficiency experts and building technicians. As a result, sensible energy CAPEX measures as well as the associated costs and possible subsidies can be determined, identified and implemented with Purpose Green.
Following the brief analysis of the building, we recommend that you promptly review and implement energy efficiency measures. According to the demand calculation carried out, the building has "high" optimization potential, which indicates an acute need for action. We therefore recommend a full ESG report including iSFP DIN V 18599. This detailed report is prepared after an on-site inspection by our energy efficiency experts and building technicians. As a result, sensible energy CAPEX measures as well as the associated costs and possible subsidies can be determined, identified and implemented with Purpose Green.
Optimization potential
Low
Contact form
More articles
About Purpose Green
Your property - our next project!
We look forward to hearing from you.
Purpose Green is one of the leading German climate tech companies based in Berlin, transforming the building sector with comprehensive end-to-end solutions for energy-efficient refurbishment and ESG-led asset management. Purpose Green is the only company in Germany to offer a holistic, modular, combinable approach for the real estate sector: its own Green+ portal links intelligent software solutions with specialist ESG and energy consulting as well as operational construction management.
Real estate owners, managers and institutional funds thus receive tailored support in the transformation of apartment buildings, residential and commercial buildings as well as office buildings - both at individual property and portfolio level. In this way, Purpose Green enables individual sustainability goals to be achieved efficiently, CO₂ emissions to be significantly reduced and properties to be future-proofed in terms of value retention and sustainable value appreciation.
Purpose Green was founded in 2023 by Okitonga Memba and the brothers Lucas and Lennart Christel. Backed by leading early-stage investors such as Speedinvest, Atlantic Labs and Fifth Wall, Purpose Green is driving sustainable change to decarbonize the real estate sector.